c

Construction of the Maria Curie – Skłodowska North Bridge Route

  • the bridge
  • the bridge
  • the bridge

Within the investment Skanska realized 1-km section of the North Bridge Route from Pułkowa junction to Młociny exchange junction.

Realization of the project involved construction of two four-lane main roadways of the route and four single-span overpasses above the Encyklopedyczna street in Warsaw.  Skanska also realized a 400-meter section of the Encyklopedyczna street with a new driveway to tramway depot, a crossing with the Zgrupowania AK Kampinos street and an underpass beneath roadways of the main route.

Scope of works included construction of a 175 m long, two-lane Nocznickiego street , reconstruction of tramway route, construction of sidewalks, inclined planes, stairs, bus and tramway stops, walkways and bicycle routes of total length of 2 km. Skanska also realized new tramway contact line as well as new power grid and reconstructed gas pipeline, storm water drainage and sanitary sewerage systems.

Results

loading