c

SR 215 Widening

  • SR 215 Widening
  • SR 215 Widening
  • SR 215 Widening

The project involves two phases, totaling 1.4 miles, which will be widened by two lanes. It also includes the rebuilding of a number of entrance and exit ramps along the stretch of highway in question, the installation of traffic signalization and construction of sound walls. Several bridges are part of the project.

Results

loading