c

Leroy Merlin in Zielona Gora

Additional information

Completing this contract  in the short time was a huge challenge. Sixty thousand cubic meters of the ground had be exchange  because of  low-strenght soil. Object was done in the reinforced concrete structure, roof with the use of the steel and casing with the composite panels. Because there was no opportunity to drain the rainwater in the traditional way we installed special boxes under the parking surface to drain rainwater into the ground.

Results

loading