c

Connection of the ring road of Wroclaw with the Wroclaw’s air port

Additional information

Investment in Wroclaw was one of the project was carried out within the praeparation to 2012 European Football Championship.

Project in figures:

  • total lenght: 1,3 km
  • sidewalks: 6,8 km
  • bicykle path: 3,4 km

Results

loading