Additional information
Skanska has executed the following tunneling and construction works on tunnel:
- The construction of temporary portals for tunnel driving
- Complete driving of both tunnels tubes
- Scaling of tunnel tubes cross-section
- Hydro-insulation execution
- Concreting of secondary lining and application of protective coating on tunnel walls
- Concreting of interior structures and cement-concrete road surface.