Construction of carriageway of eastern provincial road Bielany-Lany- Dlugoleka

Project execution

Skanska commenced the work from Stawowa street in Siechnice and will finish at Odrzanska street in Łany. As part of this task, Skanska is required to build:

  • three bridge constructions over Oława and Odra rivers, with a lenght of 102, 120 and 286m
  • two flyovers over the areas with high flooding risk with a lenght of 614 and 532m
  • 14 meter long viaduct over Odrzanska street in Łany
  • 15 underpasses for animal crossing.

The project also includes an overhaul of an old and construction of a new technical infrastructure i.e. storm drainage facilities, sewage system, gas and water pipelines, telecommunication network and electrical services etc. Side walks for pedestrians and lanes for cyclists are going to be built along the road. We are also planning to install 1700 square meters of soundproof/acoustic screens and raise 851,000 cubic meters of embankments.