Eiriksdal og Makkoren Kraftlag

  • The line of force is sketched into the chart.
  • Blue collars at work with the  concrete formwork

Construction of two new power stations in rock, to replace three, old power stations (total production of approx 340 GWh). The work includes; 6 kilometer tunnels of cross-section 20 to 36 sq.m., two power stations, intakes, two bridges, outlets and portal building together with other river-preventive work.

Both stations carries out an environmental upgrade in the vicinity by replacing old cables and pipes. This will have a positive influence on both the recreation area and the fish population in the neighbourhood to Høyanger.